Skip to content
BER-GRİT

Services

All steps from surface preparation to shipment are carried out on the same site. Your part is not divided according to line constraints; it is routed according to its geometry.

Which service is right for you

Your starting point is the condition of the part and the level of protection required by the specification.

Service selection table based on part condition
Your condition Applied Output Page
Serial profile and plate, repeated section OMSG automatic turbine line Sa 2½ or Sa 3, controlled surface profile Steel Blasting
Heavy and different geometry manufacturing that does not fit in the automatic line SAPI twin nozzle cabin, 26 m internal length Same cleaning grades, without dividing the part Large Part Blasting
Coated system to be applied on blasted surface Airless wet painting, six resin families Target DFT, layer-based record Industrial Painting
Specification defines corrosivity category Multi-layer system with ISO 12944 approach Coating suitable for C3, C4 or C5 condition ISO 12944 Corrosion Protection
Fire resistance period required on steel structure Water or solvent-based intumescent system DFT from R30 to R120 according to target Fire Protective Coating

Scope

Seven items performed in a single site. Subcontractor does not intervene from material acceptance to shipment coordination.

  1. 01 Surface preparation of steel structure, profiles, plates, and pipes
  2. 02 OMSG automatic turbine blasting and SAPI large part blasting
  3. 03 Wet paint systems based on epoxy, alkyd, zinc, aluminum pigmented, and polyurethane
  4. 04 Coating systems for C3, C4, and C5 corrosivity conditions on a project basis
  5. 05 Water and solvent-based intumescent and fire protective paint applications
  6. 06 DFT, climate, surface profile, and final quality controls
  7. 07 Packaging, storage, loading, and shipment coordination

Frequently asked questions

The most frequently asked questions during the quotation phase. If you cannot find what you are looking for, you can write directly.

You do not need to make a decision. Once the part information, current surface condition, and any existing specifications are provided, our technical team will determine the appropriate route, coating system, and scope of quality.

Yes. Surface preparation only or coating only requests can be accommodated. However, as the waiting time for a sandblasted surface is critical, performing both processes at the same facility offers an advantage in terms of quality.

Both are possible. Whether the supply is made by BER-GRİT or by the customer is clarified within the commercial scope. For customer supply, the product, batch, shelf life, and technical documents are recorded during incoming inspection.

Part list, weight and quantity, total surface area, desired Sa grade and profile, paint system or product code, number of coats, color, total DFT, desired quality tests, and target delivery date. Items you do not have can be left blank.

The turnaround time is calculated based on part dimensions, quantity, desired cleaning grade, number of coats, and curing time. Since the automatic line and booth are separate routes, serial jobs and project-based heavy parts do not delay each other.

Selections from applications

Five service items converge in one field; the following are examples of the part types to which these items are applied.

  • Wide-span red steel construction
  • Large-diameter cylindrical body manufacturing
  • Pipeline and pipe support in a petrochemical facility
  • Interior view of a white-painted steel-trussed production hall

The visuals are taken from the company's own project archive. The applications were carried out in previous years in the facility and application infrastructure where BER-GRİT operates today; project-specific technical details are subject to customer approval.

Let's determine the appropriate service together

When the part list and specification are submitted, the appropriate route, quality scope, and deadline are evaluated by our technical team.

Example: 40 tons of steel construction, Sa 2½ blasting, zinc epoxy primer and polyurethane topcoat, total 240 µm.

  • Specification and drawing file can be attached
  • Unknown technical fields can be left blank
  • A reference number will be provided after submission