HSE and environment

The aim is to create a controlled, traceable, and sustainable process for people, the environment, the facility, and customer materials while maintaining quality.

Full personal protective equipment usage in paint application.
Respiratory, eye, and body protection is determined according to the work performed.
Enclosed blasting
Management of dust and particles through controlled suction and filtration, abrasive recovery.
Paint mist and VOC
Segregated paint area, suction and filtration, controlled solvent usage, and paint consumption records.
Chemical management
Labeled closed containers, SDS and TDS instructions, spill kits, and appropriate storage.
Waste segregation
Separate management of used abrasive, paint and solvent waste, contaminated rags and packaging, and filter waste.
Pre-operation risk control
Risk control, equipment safety, and task-specific preparation are performed before each shift.
Personal protective equipment
Respiratory, hearing, eye, and body protection are determined according to the work performed.
Employee training
Pre-operation briefings and equipment usage training are implemented.
Shipment safety
Blocking, surface protection, spansetting, and controlled loading after complete drying.

Safety and quality in the same chain

Work safety, process control, and product quality are not separate; they are parts of the same operational chain.

Enclosed blasting ensures dust control; dust control is also a prerequisite for paint adhesion. Controlled solvent use is for both environmental and curing conditions.

Quality control and traceability
Surface cleaning before blasting: dust control is a prerequisite for both safety and adhesion.

Document and permit information

Environmental permit, hazardous waste license information, and management system documents are shared at the tender and pre-qualification stage.

Get a Quote

Document and permit information is shared at the pre-qualification stage

Environmental permit, hazardous waste license information, and management system documents are provided during the tender process.

Example: 40 tons of steel construction, Sa 2½ blasting, zinc epoxy primer and polyurethane topcoat, total 240 µm.

  • Specification and drawing file can be attached
  • Unknown technical fields can be left blank
  • A reference number will be provided after submission