Facility and machine park

The site is laid out to support the safe movement of heavy parts and a unidirectional process flow. Material moves in one direction from input to output.

Total operational area
10.000m² Total operational area
Enclosed blasting and painting hall
5.000m² Enclosed blasting and painting hall
Craned stock, drying, and packing
5.000m² Craned stock, drying, and packing
Hall length and width
182 × 30m Hall length and width

Site layout

182 Material moves in one direction along the hall, which is meters long, with no return. The part entering through the main door goes through blasting, painting, and drying stages and exits through dispatch.

  1. 01

    Main Door

  2. 02

    OMSG Automatic Blasting

  3. 03

    Tunnel Type Blasting

  4. 04

    Material Transfer

    Quality gate. Surface approval is obtained after blasting.

  5. 05

    Paint Application

    Quality gate. Climatic suitability is verified before painting.

  6. 06

    Drying Area

  7. 07

    Packaging

  8. 08

    Weighing and Dispatch

    Quality gate. Final visual and total DFT acceptance is performed.

Records are taken at marked stops and the next step is not taken without approval.

  • Blasting area: steel profiles entering the line on a roller conveyor.
  • Paint application area: airless application inside a closed hall.
  • Drying area: section where painted parts wait for curing.
  • Quality control: station where film thickness and surface measurements are taken.
  • Packaging area: dunnaged and strapped shipment packages.
  • Shipping: on-vehicle loading and strapping.

Facility features

  • 5,000 m² indoor blasting and painting hall Large and high-volume workspace for large and heavy parts.
  • 5,000 m² outdoor operation and logistics area On-site storage, loading, and maneuvering capabilities.
  • Automatic and tunnel blasting OMSG automatic blasting line and tunnel blasting system.
  • Large part blasting booth Double-nozzle booth for heavy fabrications that do not fit the automatic line.
  • Industrial paint application Epoxy, polyurethane, zinc-based, and project-specific systems.
  • Controlled drying area Drying and curing in a controlled environment.
  • 2 piece scale Fast and secure material receiving and dispatch.
  • Safety and occupational safety Security building, controlled entry-exit, and fire systems.
  • Environmentally conscious facility Dust collection systems, waste management, and compliance with environmental regulations.
3D process flow diagram of the facility. From left to right along the hall: paint application and drying area, tunnel type blasting, 5,000 m² blasting and paint hall, OMSG automatic blasting line. Canopy in front of the hall, Weighbridge-1 and Weighbridge-2, main entrance and security building; on the right side, stock and loading area with delivery and packaging section.
The 3D process flow diagram shows the operational areas and flow in the facility; architectural details are not to scale.
Facility layout plan: hall 182 meters long and 30 meters wide; main gate and OMSG automatic blasting unit in the west, tunnel type blasting and material transfer area in the center, paint application and drying area in the east, with a vehicle path along the hall and two weighbridges.
Scaled layout plan. The main gate is at the west end, and the paint application and drying area is in the east section.

Three functional blocks

01 Blasting areas
OMSG automatic blasting line and tunnel or cabin type blasting routes for large parts.
02 Painting and drying
Large wet paint application area, quality control flow with controlled drying and curing.
03 Logistics
Security-controlled main entrance, vehicle path extending along the hall, two weighbridges, canopy, stock, loading, and delivery arrangement with material transfer areas.

Machine park

Two separate blasting routes and a paint application unit operate within the same hall, on a one-way flow.

OMSG LAUCO 150 NP

Automatic turbine blasting line, 2016

Automated surface preparation for serial steel profiles, plates, and welded parts with suitable geometry. Closed process approach with abrasive recovery and filtration.

Suitable part
Serial profile, plate, welded part with suitable geometry
Mode of operation
Closed system, turbine abrasive blasting
Highlights
Repeatable process flow
Steel blasting with automated line

SAPI blasting booth

Large part booth with manual operator, Almanya

Flexible blasting solution for large, heavy, and steel fabrications with different geometries that do not fit the automated line. Parts are not divided according to line constraints.

Length
8 m
Width
26 m
Height
4,50 m
Nozzle
Çift
Large part blasting
The entire machine park and their specifications

Investment in a second automated profile and plate processing line is planned.

Marmara industrial basin

Proximity to the steel, machinery, automotive, energy, EPC, and port ecosystems with its Kocaeli location; the site layout, suitable for stocking, loading, and heavy part movement, facilitates shipping.

Arslanbey OSB Mah. 8. Sk. No: 8/3 İç Kapı No: 1
Kartepe / Kocaeli
Field assembly of coated heavy steel beam.
Field assembly of coated heavy beam from the facility.

Frequently asked questions

The most frequently asked questions during the quotation phase. If you cannot find what you are looking for, you can write directly.

The facility is established on an area of 10,000 m². Of this, 5,000 m² is a closed blasting and painting hall, and 5,000 m² is a crane-equipped, concrete-floored storage, drying, and packaging area. The hall is 182 meters long and 30 meters wide.

The site is laid out to support the safe movement of heavy parts. The vehicle access road runs along the hall and leads directly into it. Weighing is done with two separate weighbridges; the crane-equipped storage area is used for loading and unloading.

Material enters through the main door, passes through the blasting and painting stages, and exits through shipping. There is no return. This arrangement prevents re-contamination of the blasted surface and reduces waiting times for parts.

Two separate routes are in operation. The OMSG LAUCO 150 NP automatic turbine shot blasting line is used for serial profiles and plates, while the SAPI double-nozzle cabin is used for large and differently geometrically manufactured items that do not fit in the automatic line. The decision is made at the quotation stage based on the part's size and geometry.

The 5,000 m² crane-equipped area is used for drying, curing, and pre-shipment waiting. Parts are not loaded before complete drying is achieved. The storage duration is determined at the quotation stage according to the project plan.

Let's determine together which route is suitable for your part

When size, weight, and quantity information is shared, suitability and timing between the automatic line and the cabin route are evaluated.

Example: 26 m long body, 18 tons, Sa 2½.

  • Specification and drawing file can be attached
  • Unknown technical fields can be left blank
  • A reference number will be provided after submission